Brownfield Project Experience

Brownfield Mining Plant Relocation - Poland to Finland (Part 1-Material Screening and  Crushing System)
Location: Finland

Services: Structural Analysis and Foundation Design, Layout and Conveyor Modification, Project Coordination with Fabricators and Contractors

Description: KTC relocated a slag recovery plant from Poland to Finland in 2021.
The project was challenging because the natural conditions in Finland and Poland are diametrically different. The project was built on the border of the Arctic Circle, which placed increased demands especially on steel structures. The objective of the project was to move the existing plant (supplied from Poland) to increase mining efficiency by re-engineering the overall layout and adding in new equipment. Part 01 is material screening and crushing system (conveying, screening, size reduction).
010.png
Image-3D model rendering of Material Screening and Crushing System (isometric view)
011.png
Image-3D model rendering of Material Screening and Crushing System (plan view)
012.png
Image-3D model rendering of belt conveyor feeding into screening system and its support structural steel 
013.png

Image-3D model rendering of belt conveyor feeding vertical hog system and its support structural steel 

Brownfield Mining Plant Relocation - Poland to Finland (Part 2-Jig Plant Material Processing System)
Location: Finland

Services: Structural Analysis and Foundation Design, Layout and Conveyor Modification, Project Coordination with Fabricators and Contractors

Description: KTC relocated a slag recovery plant from Poland to Finland in 2021.
The project was challenging because the natural conditions in Finland and Poland are diametrically different. The project was built on the border of the Arctic Circle, which placed increased demands especially on steel structures. The objective of the project was to move the existing plant (supplied from Poland) to increase mining efficiency by re-engineering the overall layout and adding in new equipment. Part 02 is jig plant material processing system (conveying, mixer, tanks).
015.png
Image-3D model rendering of Jig Plant Material Processing System (isometric view)
016.png
Image-3D model rendering of Jig Plant Material Processing System (plan view)
017.png
​Image-3D model rendering of belt conveyor feeding from outside into a screen that is inside the building at the beginning of the process
018.png
​Image-3D model rendering of a tank and its structural steel inside the building
PIC_0037_edited.jpg

GET IN TOUCH

WE LOOK FORWARD TO HEARING FROM YOU

ADDRESS
Unit 201-15315 31st Avenue Surrey B.C., Canada V3Z 6X2

PHONE
604-591-3123

EMAIL
info@ktceng.ca

  • LinkedIn
  • YouTube

Copyright KTC Industrial Engineering Ltd 2025
All Rights Reserved.

bottom of page